Total Solution
We provide comprehensive support and propose the best solutions to our customers aiming of providing total solution services in the equipment process.
- Equipment Production
- Comprehensive support for specification studies, design, and operation adjustment
- Equipment Management
- Comprehensive support for the purchase of consumables required for maintenance, inspection, modification, and running after the equipment is in operation.
- Equipment Relocation
- Comprehensive support from proposals for specifications and layout to dismantling, transportation, installation, and restoration operation adjustment of equipment.
- Idle Equipment Management
- Comprehensive support for conversion, sale, and scrapping of unused equipment
Equipment Production
We will propose a design that puts the customer's safety first, and provide total support from design to operation and adjustment, such as remodeling new equipment and existing equipment, and renewing idle machines. (Overseas use is also available)
In-house production equipment
Bush Press Fitting Machine, Magnetic Flaw Detector Remodeling
We propose designs that put the customer's safety first, and provide total support from design to operation adjustment, such as remodeling new equipment and existing equipment, and renewing idle equipment. (Overseas use is also available)
New equipment: e.g. Bush Press Fitting Machine
Bush press fitting device using Astemo AP press machine.
Automatic press fitting of two types of bushings, large and small, with a single equipment.
We provided total support including centering of each part, condition setting, and post-delivery support.
Modification of existing equipment (renewal of idle equipment): Magnetic Flaw Detector Remodeling
We provided total support from cleaning aging stains and paint, replacement and addition of various switches, touch panels, PLC, etc., circuit design and configuration to operation adjustment.
Before remodeling Magnetic Flaw Detector
After remodeling Magnetic Flaw Detector
Bush models
Bush Press Fitting Machine
Equipment Relocation
We relocated equipment from Ayase-city, Kanagawa prefecture to Date-county, Fukushima prefecture.
Relocation period: 12 months
Approximately 110 lines, number of equipment per line / 12 on average (completion of equipment relocation work over 25 times)
We provided total support from the disconnection of the secondary side of each equipment to dismantling, carrying out, transportation, carrying in, installation, restoration (wiring, piping, centering, leveling), carrying out, traffic guidance during transportation, and equipment cleaning.
If ordered, we can also provide total support for pulling in the primary side.
The average of 12 units per line is calculated based on the number of lines 110 from approximately 1,370 units of equipment.
Equipment Management
We perform maintenance work such as inspection, maintenance, and repair of equipment to ensure the safety of our customers' field operation and to allow them to work with peace of mind.
In addition to equipment, we also handle inspections of heat treatment furnaces and repairs to buildings by qualified personnel in mechanical maintenance, electrical, crane and slinging work responsibly based on their abundant experience.
We also centrally manage and share information on unused idle equipment and spare parts in each customer's factory, and help customers choose the best method from the three phases of conversion, sale, and scrapping.
- Phase 1:
- Curb capital investment through effective use of idle equipment and spare parts
- Phase 2:
- Generate cash flow by selling to other companies
- Phase 3:
- Reduce management costs through scrapping